Maxizip.com

0 Museum Of Shanghai World Expo Ambitious 24


It is not HC air conditioning R ancient Roman consumption network, was built the fat meal. However, the Universal Expo Hall Grand West Shanghai zone Pavilion was built in one day but it is something a little suspect is certainly. 6 Media staff members, to attend Hall of wonders of the West of the exposition buildings in the great Hall of the number of journalists to enter the area.

1, Pavilion building.

Latest current Expo Hall opening and grand halls within 24 hours to 6th floor miracle, the Expo Hall, was in the shortest amount of time, to complete the construction of the building. We wait and see on how to complete the construction of today’s miracle, big room.

Construction the Museum’s great Hall of land adjacent to the Museum Park, air preparation, other companies, already completed, and at some grounds to stages of interior decoration.

Related articles

80 Landscape uses led lights in the site is the Shanghai Expo.

It is revealed to be in the Universal Exposition in Shanghai, on the site of the exposition about 80 light landscaping LED lights 2010.

Mark Yao Yao national trademark Expo world debut.

4 Opening, and yesterday, a colorful new Conference heard in Shanghai’s stunning Yao Yao DEVNET International Expo Center Grand HC shoes network information. At the moment

Shanghai tour tunnel classification than seductive psychedelic light Metro

Many people according to foreign media reports, now held at the Universal Expo Shanghai Expo Park walked around, good opportunities for visiting tourists, Shanghai

Mountain NET help Rui LED network sharp leads the trends of LCD TV network appliance Industryhc360 HC mountain Exposition low plate led

HC home network news, with opening of Shanghai World Expo, Expo on green concepts the world everywhere. 50 The wall ecogreen 000 square meters.

Now, it’s great Hall prior to space only. A few signs do not build the road to nextonly tracks containing component load is not dock, showroom sites cement, sand, etc. To make the day so that it is difficult to imagine a time in the Hall on the banks of the river you can.

In 7 to start the root installation time, cold, rainy weather, the first elements of Hall space. Changsha broad air conditioning Vice President, Director of Land Rover Office pile underground author plus Expo, Hall steel, walls and air conditioning system interfaces are expected to be completed in one day and drainage that installs Windows and other components.

Corporate Pavilion Park band, estimated in about 10 minutes, windows, small shows intention, pointing to the concepts of energy efficient buildings.

Ambitious around site 8, great Hall of the Museum of green energy is already a hive of busy scenes one. 3 Alternate track number on the side, waiting for the orderly operation of block 3 of container cranes, lift trucks, steel, installing components. Time to install lifts from time to time, site component at between 20 to 30 minutes.

According to the Land Rover, these components are the work production at the factory prior to introduction of only scene ‘Assembly’ in two months. Pavilion 100 factories, many engineering and to save costs to install locally to achieve zero waste is. About 200 kg of traditional construction waste sq. metres per generation is 50,000 m2 of strengthening waste emissions of about 100000 tons.

In the media Hall of safety issues, Land Rover, noble Hall 9 degrees by seismic testing description of the State and the highest level. Architectural features world exhibition of Secretary General of the ambitious project of Tang Ying, as well as of the Hall to save five times, energysaving building student’s other six times, he said. Pavilion building and “citizens” “no decoration, living embodiment of the idea of energy saving and environmental protection.

Low of the ambitious operation 2 at around big hole Museum always intense construction of rain is. And as the author said the Commander in Chief of Phillipson, great Hall, sustainable building great Hall, exhibition hall walls, roof insulation window, 3 layer glass windows box and automatic window shades and automatically to the window heat recovery fan of insulating plastics use 170 mm foamed polymer displacement of cold and hot air circulation, new heating and cooling system uses. Walls, Windows, heating and air conditioning, summer, even if the building’s ventilation 3 “zero tolerance” will too cold to the human body as lighting, electric heating, energy consumption, without winter insulation measures only 20 traditional construction is about.

Is the “breath” of ultra clean construction.